Product description:


 

CZPT Requirements
one. Decoiler
With two tapered electrical bulgy clamps, and its carrying potential is 8 tons. The internal diameter of the roll substance is about 500 to 600mm, the greatest diameter of steel coil is 1800mm. Clamp motor energy is two.2kw with 4-pole standard motor. Undertake ZQ250 pace reducer, its pace ratio is 31:5.

2.Leveling Machine
Wallboard 7-roller leveler with two-roll pinch and 5-roll leveling. Leveling roller diameter is 110mm. The leveling machine ahead of and soon after has vertical information roll. Feed inlet port equipped with nip rolls.
substance: 40Cr, quenched hardness: HRC48°~52°, motor energy:seven.5kw, six-pole typical motor, ZQ350speed reducer, speed ratio: twenty:49, φ200 arrester brake.

3.Punching Equipment
Adopt YL32-315 4-column hydraulic punching machine, and hydraulic station motor electricity is 22kw. One particular set of two waves guardrail plates punching chopping die, design and procedure mostly according to users’ style drawings. The content of mould inserts and plunger chip is Cr12MoV alloy metal. The punching machine prior to and following geared up with adjustable information roll. (guidebook roll substance: Cr12MoV, hardness: HRC58º~60º) Besides, it also outfitted with a set of spare blade and plunger chip.

four.quick feeding content mechanism
It has two pairs of feeders and needs two gets 1.
pinch immediately, motor electricity:two.2 kw, ZQ250 speed reducer, hand-flip compressing

5.Photoelectric Size-measuring Gadget
variety: two pairs, lower length: 4320mm, duration accuracy < ±3.0mm

6. Major Forming Motor
This unit includes 11 molding procedures with independent open up arch structure.
The mechanical spreading width : 550mm.
Arch content : HT200 , tempered.
The column cross-segment dimensions: eighty x 70, with sufficient power and reputable quality assurance. Vertical guiding roller quantities: 3
Roller diameter of vertical guiding roller: 80 
Content: 40Cr metal, quenched and tempered.
CZPT sort: Mounted floor 7216, regulation 32216, each and every has 4.
Figures of dual-axis gear box: one
Figures of one-shaft transmission equipment box: 9 
Bevel modulus: M=nine
Equipment box substance: HT200.
Host energy: 45KW r, electromagnetic pace regulating,
Speed reducer: ZQ650
Pace ratio: forty eight.57
Use 1 inch double chain generate among the transmission gear box universal transmission shaft between the roller shafts, and the universal transmission shaft sort is140-275. Use 1.5 inch dual chain travel amongst the pace reducer.

7.Forming Mold
A established of two wave guardrail plate roll forming die, made and processed according to the nationwide common. The material is GCr15, and the general quenching hardness is HRC58°~ 62°.

eight.content Acquiring Platform
Roller variety material obtaining station, 5m duration, six# steel welded.

nine.Control System
Widespread handle system. Can manually and routinely management the harmony of various areas of of the total manufacturing line.

10.Other people
The gear whole power is 78.9Kw, with 30000mm * 4000mm size * width. The highest rolling peak is 85mm, the highest rolling thickness is four.0mm, and the optimum rolling velocity is three ~ 12m/min. Structural components of welding device seat must meet up with the requirements, welding should be up to the countrywide regular . Products following rust cleansing ought to be to begin with coated with steel unique anti-rust paint comprehensively masking, and then coated with large top quality topcoat. The rotating element should be divided by warning colour.

FAQ
one.Q: Are you producer or investing company?
A: We are manufacture and trading firm.
two.Q:What info you want ahead of you make the proposal?
A:The pipe diameter and thickness variety which you need to have or the profile drawings, content information, your special specifications.
three.Q: what is the MOQ?
A: A single established
four.Q: Do you supply putting in and debugging abroad?
A: Overseas machine put in and worker training companies are optional.
five.Q: Can you make the device in accordance to my design and style or prototype?
A: Indeed, we have an skilled crew for doing work out the most appropriate design and generation prepare for the equipment that you are going to guide with us.
6.Q: How does your factory do with regards to good quality manage?
A :There is no tolerance concerning good quality manage. Good quality management complies with ISO 9001.each device has to past screening managing prior to it truly is packed for shipment.
seven.Q: How can I have confidence in you that equipment pasted tests managing just before transport?
A: 1) We file the testing video clip for your reference
two) We welcome you visit us and test device by by yourself in our manufacturing unit.
8.Q: What about our following-sale service?
A: we supply specialized assistance on line as nicely as abroad companies by skillful specialists.
9.Q: What ought to I do if I just begin a new company?
A:Make contact with us right away ,we give totally free advisor pre-income services.Also we can assist you to remedy the material(steel coil)acquire,employee teach,worldwide market value.
ten. Q:Can I visit you manufacturing facility to check out machines on-internet site ? What Need to I provide when I visit your manufacturing unit?
A: We are manufacturer, and we welcome buyers to check out our manufacturing facility. For particular solution design and produce, we request you bring a piece of tests materials, you can examination on our devices on-web site.

 